Before you enquire
Start with the areas you want painted and how the property is used.
01Can we discuss the project from photos before a site visit?
Yes. For a home repaint, our team discusses the areas involved and an initial indicative price before arranging an assessment. Photos and a description of the surfaces help that conversation. The site visit then checks condition, preparation and access so we can prepare the detailed proposal. An early price discussion does not replace that assessment.
02Can I ask about selected rooms, exterior details or timber together?
Tell us exactly which areas you want considered. Interior requests can cover selected rooms or ceilings, while exterior doors, trims and fences can be assessed alongside the walls. Decks, timber stairs and bifold doors fall within our timber restoration service. Each surface is assessed before we confirm what can be included; preparation and finishes may differ across the project.
03Can stairwells, voids and high ceilings be included?
Yes. These areas are part of our interior painting capability. Point them out when you enquire so we can assess the height and practical access during the site visit. Access requirements help define the proposed work; a high area should not be assumed to have the same preparation or setup needs as an easily reached wall.
04Can painting be planned around customers and deliveries?
Raise customer access, delivery times and busy trading periods during the assessment. Our commercial work includes shopfronts, restaurants and tilt-slab buildings, each with different access needs. We discuss whether the proposed schedule can accommodate your requirements before agreeing on the work. After-hours painting and uninterrupted trading are not assumed to be available for every project.
Agreeing the work
Confirm the surfaces, responsibilities and selections before the project is scheduled.
01What should I check in the proposal before approving it?
Check that it identifies the areas you expect, the preparation and coating systems, colour requirements and payment arrangements. Raise anything you want added or removed while the scope is being reviewed. For body corporate work, the proposal also records inclusions, exclusions, access and staging. The written scope is the reference for what the team is being asked to complete.
02When do we choose colours, and how do the painters receive them?
For exterior painting, we arrange colour consultation after proposal approval. Interior colours are confirmed before scheduling. Eileen from In Style & Colour receives the scope, meets with you and develops colour concepts for your sign-off. The agreed selections are sent back to Pether's for the job's colour schedule, so the painting team has the confirmed choices before work begins.
03If roof restoration is included, who is responsible for that work?
Roof restoration is a separate specialist scope delivered by a licensed roofing partner. The partner assesses the roof, completes the agreed repairs and preparation, applies the specified coatings and performs the technical checks. Pether's prepares the client proposal, coordinates scheduling and communication, and follows up on the completed scope. Suitability and the work included are confirmed after assessment.
04What if a wall has water stains or damaged plaster?
Tell us about the affected areas and any known leaks during the assessment. Patching, filling, sanding, surface repairs and stain-blocking can be included where required in the agreed interior scope. Those preparation items do not establish or resolve the cause of a leak. Ask what needs attention before painting and check that the proposed repair work is clearly identified.
05Does approving a proposal confirm our start date?
Approval and scheduling are separate steps. For a residential repaint, the booking deposit opens scheduling; operations then confirms timing, access, colours and pre-start details. The proposal's timeframe is indicative, with expected dates confirmed when scheduling is finalised. Tell us about important dates early, and check the payment and scheduling arrangements in your own proposal rather than treating a requested date as booked.
Getting ready
Agree how the team will access the property and what needs to be ready.
01Can we stay at home during an interior repaint?
We work in occupied and vacant homes. Tell us which rooms you rely on so access and staging can be discussed before the start. Staging can reduce disruption, but it does not mean every room will remain available throughout the work. A vacant or mostly cleared home allows smoother progress; the practical arrangement needs to suit your particular scope.
02What should we move, and what will the team protect?
Clear rooms or move furniture away from the walls where practical, and remove fragile items, valuables, electronics and wall hangings. If a full clear-out is not possible, discuss the items that need to remain and whether help arranging storage is needed. We cover and protect flooring, agreed remaining furniture and fixtures. Confirm the arrangements before the start; moving and storage services are not automatically included.
03Do I need to stay home while the exterior is painted?
Not necessarily. Exterior painting can proceed while you are away when access arrangements have been confirmed beforehand. Agree how the team will enter, reach the included areas and use water or power where required. Keep pets secure and clear vehicles and outdoor belongings from the work areas. Share any sensitive gate or alarm instructions directly with the team before the start.
04What if flooring work or another trade changes when the area is ready?
Tell operations when other work affects access or the readiness of the surfaces to be painted. Discuss the sequence before the team arrives; if flooring is being replaced, that includes when the existing flooring should be removed. Keep the team informed when plans change so the painting schedule can be reviewed. A changed building program does not automatically confirm a new painting date.
05What needs to be agreed before residents receive a repaint notice?
For body corporate projects, resident notices are planned before work starts. They cover the affected areas, access requirements, expected timing and likely disruption. The manager or committee and operations team need clear points of contact, with practical arrangements for belongings, vehicles and shared access considered in the plan. Notices should reflect the agreed staging, rather than leaving residents to guess when their area is affected.
06Will low-odour paint mean there is no smell inside?
No. We use low-VOC, low-odour interior products, but some paint smell may remain during application and curing. Ventilation is used to manage it. Discuss the rooms being painted and how you will use the home when planning access and staging. Low odour should not be read as a promise of a smell-free repaint or a fixed time for every room to be back in use.
While work is underway
Know who to speak with as the work progresses and circumstances change.
01What happens before preparation starts on the first day?
You meet the foreman and review the agreed work and site requirements. The team confirms the work areas and where paint and materials will be set up. Surrounding surfaces are protected before the specified preparation begins. Use that walk-through to clarify access and anything you believe differs from the agreed scope, rather than assuming it has already been passed on.
02Who supervises the painters and keeps us informed?
Our employed Pether's painters work under foreman-led supervision, supported by operations oversight. The foreman is involved in day-to-day site communication. For body corporate projects, progress updates to managers and committees come through operations, with clear points of contact established. Roof restoration has a separate licensed partner responsible for the roofing work, while Pether's coordinates the client communication.
03What happens to exterior work if the weather changes?
We monitor the weather before and during the project and adjust scheduling where needed to protect the finish. You are kept updated when the plan changes. For roof restoration, weather can also change the timing of access and coating application. Ask the team about the revised arrangements; an indicative finish date should not be treated as a promise that painting will continue in unsuitable conditions.
04How do we ask for extra areas or a change to the work?
Raise the request with the foreman or operations team and identify what you want changed from the agreed proposal. Ask for the scope and any cost or scheduling implications to be reviewed before assuming the extra work is included. For body corporate projects, additional work follows an approval process, with scope and cost confirmed in writing before it proceeds.
Handover and aftercare
Review the completed scope and understand how to look after the finish.
01How is the finished work checked before handover?
For interior and exterior repaints, the foreman inspects the work before operations sign-off and a walk-through with you. Required touch-ups are addressed, and the completed scope is reviewed at handover. Body corporate work includes a documented handover. Roof restoration is checked technically by the licensed roofing partner, with Pether's following up on the completed scope and any items requiring attention.
02What happens to the coverings and equipment, and will we receive care advice?
At handover, protective coverings and equipment are removed and the work areas are cleaned. We review the completed scope and provide guidance on caring for the new finish. Ask about care for the particular surfaces and coatings used on your property. A painted wall, a restored deck and a roof coating should not be assumed to share one cleaning method or maintenance interval.
03What warranty applies to the work we are considering?
Pether's provides a one-year workmanship warranty. Manufacturer coating warranties are separate and may apply where work is completed to a Dulux specification. Roof restoration is a separate partner-delivered service, so the roofing warranty needs to be confirmed for that work. The painting warranty should not be assumed to extend unchanged to every service, surface or product.
